上海复兴东路越江隧道工程是我国第一条双管双层公路隧道,设计较为先进,采用11 220mm大型泥水平衡盾构,在穿越黄浦江底施工过程中,解决了复杂施工环境下的多项难题,其施工技术在软土隧道工程中具有代表性。
Shanghai Fuxing east road tunnel project is the first double-decker and double-circle tunnel,and it is of advanced design.During the construction,it plays an important role to solve the problems about the large slurry shield tunnelling and the influence between the two shields in complex geological condition.This technology is a typical example in the tunnel construction.