摘要
对任何工程项目来说,质量都是决定项目成败的关键,而水利工程受水文、地质等条件影响,质量问题更加复杂多变,难以控制。本文正是针对于此,利用WBS对某碾压式土坝填筑工程进行结构分解,使整个工程的质量控制活动变得条理化。
Quality is the key for evaluation of the engineering projects.The issues of quality control within hydraulic projects become more complex and uncontrollable due to the hydrological and geological conditions.For solving these issues,WBS is involved in determining the quality control points for rolled earth fill dams and there for the quality control was aciereal.
出处
《山东农业大学学报(自然科学版)》
CSCD
北大核心
2012年第1期110-113,共4页
Journal of Shandong Agricultural University:Natural Science Edition
关键词
项目管理
WBS
碾压式土坝
质量控制
project management
WBS
rolled earth fill dams
quality control