期刊文献+

深水半潜式起重船J-Lay系统布置研究 被引量:11

An investigation on J-Lay system arrangement of deepwater semi-submersible crane vessel
在线阅读 下载PDF
导出
摘要 为适应多功能作业需求,大型深水半潜式起重船往往配备J型铺管系统。由于起重船吊机占有很大甲板面积和重量,J型铺管系统的布置对结构强度、船舶稳性等都有较大影响。通过对国际上已有深水半潜式起重船J-lay系统的布置方案进行对比分析,提出了深水半潜式起重船J-Lay系统布置的优选方案。 In order to adapt the requirement of the multi-function operation,the deepwater semi-submersible crane vessel usually equip the J-Lay system,which influence the structure intensity and ship stability as the deck areas and weight will be taken up by heavy lift cranes.This paper presents the optimal plan of J-Lay system arrangement of deepwater semi-submersible crane vessel based on comparison among J-Lay system arrangement plans of current deepwater semi-submersible crane vessels in the world.
出处 《船舶》 2011年第5期5-9,共5页 Ship & Boat
基金 国家科技重大专项:"深水铺管起重船及配套工程技术"课题经费资助(编号2008ZX05027-002)
关键词 深水铺管起重船 J型铺管系统 布置 方案比较 deepwater crane vessel J-Lay System arrangement plans comparison
  • 相关文献

参考文献7

  • 1DNV-OS-F 101, Submarine Pipeline Systems [ S ].2007. J.
  • 2-lay Considerations [ z ]. GustoMSC, 2007.
  • 3Mikael W. Braestrup ect. Design and Installation of Marine Pipelines [ M ]. Blackwell Science, 2005.
  • 4www.saipem.com [OL].
  • 5www.heerema.com[OL].
  • 6www.technip.com [OL].
  • 7M. Cavicchi ect. J-lay Installations Lessons Learned[J] . OTC 15333,2003.

同被引文献43

  • 1王世圣,谢彬,曾恒一,冯玮,李晓平,张海滨.3000米深水半潜式钻井平台运动性能研究[J].中国海上油气,2007,19(4):277-280. 被引量:53
  • 2中国船级社.海上移动平台入级与建造规范[s].北京:人民交通出版社,2012.
  • 3BAI Y,BAI Q.Subsea pipelines and risers[R].Great Britain:Elsevier Ltd.,2005.
  • 4GERWICK B C.Construction of marine and offshore Structures[M].USA:CRC Press,2007.
  • 5WEST C,ARMSTRONG S,MCMILLAN D,et al.S-lay installa tion of riser fairings for the independence hub[C]//Proceedings of the International Conference on Offshore Mechanics and Arctic Engineering,2007 (1):515-525.
  • 6WOLBERS D,HOVINGA R.Installation of deepwater pipe lines with sled assemblies using the new J Lay system of the DCV Balder[C].OTC 15336,2003.
  • 7PULICI M,TRIFON M,DUMITRESCU A.Deep water sea lines installation by using the J lay method:The blue stream experience[C]// Proceedings of the International Offshore and Polar Engineering Conference,ISOPE,2003:585-590.
  • 8CAVICCHI M,ARDAVANIS K.J-Iay installations lessons learned[C].OTC 15333,2003.
  • 9SALOM(E)P,KARJADI E,KLEIJNE E.Development of new generation collar for J-lay heavy pipeline installation[C].OTC 22006,2011.
  • 10SAIPEM 7000[EB/OL]. http://www.saipem.com/site/home. html.

引证文献11