期刊文献+

压水堆核电厂辐射监测系统的设计与改造 被引量:8

Design and Retrofit of Radiation Monitoring System for the PWR Nuclear Power Plant
在线阅读 下载PDF
导出
摘要 辐射监测系统是压水堆核电厂安全运行的重要保障,研究压水堆核电厂辐射监测系统的设计方法和原则,对于提高压水堆核电厂辐射监测系统的设计水平,减少改造风险至关重要。根据核电厂的法规和设计规范,结合大亚湾核电厂辐射监测系统的设计与改造经验,提出了压水堆核电厂辐射监测系统的一般设计原则和要求,并简要介绍了大亚湾核电厂辐射监测系统的改造措施及方法。 Radiation monitoring system is important for the PWR nuclear power plant,and the research of design methods and principles for the radiation monitoring system can greatly improve the design ability of the system for PWR nuclear power plant,and reduce the risk of system retrofit.According to the Nuclear power plant regulations and design specifications,and taking the design and retrofit experience of the radiation monitoring system in Daya Bay Nuclear Power Plant into account,the general design principles and requirements of the radiation monitoring system in the PWR nuclear power plant is proposed,and the retrofit method of the radiation monitoring system in Daya Bay Nuclear Power Plant is briefly introduced.
出处 《核电子学与探测技术》 CAS CSCD 北大核心 2011年第8期908-911,915,共5页 Nuclear Electronics & Detection Technology
关键词 辐射监测系统 压水堆核电厂 设计与改造 Radiation monitoring system PWR nuclear power plant Design and retrofit
  • 相关文献

参考文献5

二级参考文献8

  • 1NRC Regulations Title 10, Code of Federal Regulations, Part 20.
  • 2R. G. 1. 97 Instrumentation for light- water-- cooled power plants to assess plant and environs conditions during and following an accident, 2006.
  • 3NUREG--0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants.
  • 4NUREG--0700, Human--System Interface Design Review Guideline, Nuclear Regulatory Commission, May 2002.
  • 5凌球,郭兰英等,核电站辐射测量技术[M].北京:原子能出版社,1998.6.
  • 6IEC 61000- 4- 1 - 16, Electromagnetic Compatibility (EMC).
  • 7国家发展和改革委员会,核电中长期发展规划(2005-2020年)[R].2007.10.
  • 8徐进财,凌球.从某核电站运行情况分析今后辐射监测系统设计的改进[J].核电子学与探测技术,2007,27(6):1077-1082. 被引量:4

共引文献28

同被引文献44

引证文献8

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部