摘要
通过灌浆试验为在高水头、大涌水情况下,帷幕设计提供可靠依据,使灌浆孔布置和灌浆参数更为合理。并针对本工程出现的灌浆涌水、吃浆量大等特殊情况所采取的处理措施进行探讨和研究。
Through grouting test,reliable basis is provided for design of curtains,under high head and large water gushing and the arrangement of grouting holes and grouting parameters are more reasonable.In the light of water gushing and large grout take during grouting for the project,treatment measures are studied.
出处
《西北水电》
2011年第5期27-29,共3页
Northwest Hydropower
关键词
蜀河水电站
高水头
大涌水
帷幕灌浆
Shuhe hydropower project
high head
large water gushing
curtain grouting