基于结构方程模型的大型工程建设项目关键风险因素及作用机理研究

Researches on Key Risk Factor and Mechanism of Large Construction Project Based on Interpretative Structural Model
原文传递
导出
摘要 在分析我国大型工程建设项目风险特征的基础上,构建项目风险识别框架。并通过因子分析识别出自然环境、技术、组织管理、资源管理、分包商管理、环保等6方面是大型工程建设项目的关键风险因素。此外,还研究了大型工程建设项目关键风险因素的作用机理及作用模型,并采用结构方程模型检验。 A modeling framework is put forward on perceived risks of key risk factors, based on distinctive characteristics of large construction project in China. The result based on data analysis shows that the key risk factors are environmental risk factor, technical risk factor, organization management risk factor, subcontractor management risk factor and environmental protection risk factor. Furthermore,interpretative structural model are used to analysis the hierarchical relationship among risk factors and mechanisms. These research findings are constructive in both theory and practice to the large construction project of China.
出处 《世界科技研究与发展》 CSCD 2011年第5期932-936,共5页 World Sci-Tech R&D
基金 国家自然科学基金(70972126) 高校博士学科点专项科研基金项目(201061021 10042)资助项目
关键词 大型工程建设项目 关键风险因素 作用机理 结构方程模型 large construction project key risk factor mechanism interpretative structural model
  • 相关文献

参考文献9

二级参考文献27

  • 1向鹏成,任宏.国际工程承包风险的模糊综合评价[J].数学的实践与认识,2005,35(6):30-34. 被引量:11
  • 2张学志,陈功玉.AHP与Delphi法相结合确定供应商评价指标权重[J].物流技术,2005,24(9):71-74. 被引量:28
  • 3吴艳霞,王雷,殷仲民.基于投资方角度的项目融资风险分配研究[J].重庆建筑大学学报,2006,28(2):115-119. 被引量:16
  • 4岳超群.决策理论与方法[M].科学出版社,2003.
  • 5Martin Barnes.A Long Terra View of Project Management--Its Past and Its Likely Future[C].16th World Congress O I Project Management-Berlin,2002.
  • 6[美]戴维·克利兰(David I.Cleland),[美]刘易斯·艾尔兰(Lewis R.Ireland)戴维·克利兰.项目经理便携手册[M].北京:机械工业出版社.2002.
  • 7Lai V.S. ,Wong B.K.,Cheung W.Group Decision Making in a Multiple Criteria Environment:A Case Using the AHP in Software Selection[J].European Journal of Operational Research,2002,137(1).
  • 8Wu Lizhi,Han, Botang.Fuzzy Comprehensive Evaluation on City Fire Risk[J].Process in Safety Science and Technology, (Part B), 2002,(3).
  • 9Shan Feng,Li D Xu.Decision Support for Fuzzy Comprehensive Evaluation of Urban Development [J].Fuzzy Sets and Systems, 1999,105(1).
  • 10Yang Shu, Gao Li-Qun,Wang Rong,Bian Li-Ying.The Automation Recognizable Method of Toe Shape Based on Fuzzy Comprehensive Evaluation[C].2005 International Conference on Machine Learning and Cybernetics, ICMLC,2005.

共引文献70

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部