期刊文献+

基于SEEP/W的重力坝渗流稳定分析 被引量:4

The Gravity Dam Seepage Stability Analysis Based on the SEEP/W
在线阅读 下载PDF
导出
摘要 针对某水电站的复杂地质条件,利用SEEP/W软件对重力坝挡水坝段在两种工况下的渗流稳定性进行了分析。结果表明,该水电站以垂直防渗墙为主、水平防渗与排水、滤水措施相结合的防渗体系的布置结构合理,可以有效地降低闸基渗透压力和控制基础渗流量,能够满足地基的渗透稳定性要求。 For the complex geological conditions of a hydropower station, use SEEP/W software to analyze the seepage stability of the retaining dam section of the gravity dam in two conditions. The results show that the arrangement structure of seepage system depending on vertical antiseepage wall, combing horizontal anti-seepage with drainage, water filtering measurement, is reasonable, can effectively decrease the pressure of sluice foundation seepage and controls seepage flow, meeting the requirement of the seepage stability of foundation.
作者 陈向阳 庹涛
出处 《中国水能及电气化》 2011年第10期20-22,32,共4页 China Water Power & Electrification
关键词 重力坝 渗流 稳定性 gravity dam seepage stability
  • 相关文献

参考文献4

二级参考文献8

  • 1罗守成.对深厚覆盖层地质问题的认识[J].水力发电,1995,22(4):21-24. 被引量:37
  • 2顾慰慈.渗流计算原理及应甩[M].北京:中国建材出版社,1986.
  • 3SL265-2001.水闸设计规范[S].[S].,..
  • 4毛昶熙.渗流计算分析与控制[M].北京:水利电力出版社,1988.97-123.
  • 5杨光伟.闸坝深厚覆盖层基础处理研究[D].成都:四川大学,2005.
  • 6朱建业.选择坝址要注意研究的地貌地质条件[J]水力发电,1987(07).
  • 7石金良.大渡河河床深厚覆盖层及其工程地质问题[J]四川水力发电,1986(03).
  • 8宋胜武.冶勒水电站坝址水文地质条件及坝基防渗处理的建议[J].水电站设计,1992,8(2):36-42. 被引量:4