期刊文献+

汽车混流总装配线系统TCPN建模与平衡仿真优化

Automobile inter-flow assembly line system TCPN modeling and balance simulation optimization
在线阅读 下载PDF
导出
摘要 运用建模仿真方法研究了实际中小型客车厂混流装配线系统平衡问题。在对混流装配线物流系统建立时间着色Petri网(TCPN)模型的基础上,应用物流软件AutoMod,重点对该系统进行仿真优化。对原实际客车混流总装配线进行仿真分析,发现系统各工位的资源利用率很不平衡,并且存在瓶颈。通过资源调整,从整体上改进优化了总装配线系统,使工位资源利用率更平衡,客车在总装配线上的等待数量减少约47%,下线产量提高了8%,明显提高了系统的效率。 The paper studies actual balance issue of interflow a ss embly line of medium and small scale passenger car manufactory using modeling an d simulation.Based on the colored Petri net(TCPN)modeling of interflow assemb ly line,the paper applies simulation and optimization to the system using logis tics software AutoMod.It found from the simulation analysis applied to the actu al interflow assembly line that the resource utilization at each station of the system is very uneven,and the system is confronted with bottlenecks.By resourc e adjustments,the paper improves and optimizes total assembly line system on an overall basis,allowing more balanced station resource utilization,about 47% r eduction in total number of buses waiting on the total assembly line,and 8% inc rease in output,which significantly improves the efficiency of the system.
出处 《起重运输机械》 2011年第10期16-20,共5页 Hoisting and Conveying Machinery
基金 江苏省高等教育自然科学基金(09KJD580005) 江苏省公派留学基金(德国)
关键词 汽车 混流总装配线 系统平衡 建模 仿真优化 automobile interflow assembly line system balance mo deling simulation optimization
  • 相关文献

参考文献10

  • 1Pajie. Logistics techno!ogy application in ShenLong Auto- mobile Ltd [ J ]. Industrial engineering and management, 2000 (2): 49-53.
  • 2Bukchin J, Dar-EI E M, Jacob R. Mixed model assembly line design in a make-to-order[ J]. Environment Comput- er and Industrial Engineering, 2002, 41 (4): 405- 421.
  • 3Thomopoulos N T. Mixed model line balancing with smoothed station assignments [ J ]. Management Science, 1970, 16 (9): 593-603.
  • 4Roberts S D, Villa C D. On a muhiproduct assembly line- balancing problem [ J ]. AIIE. Transactions, 1970 (2) : 361 -364.
  • 5Dar-EI E M, Rubinovitch Y. MUST-a multiple solutions technique for balancing single model assembly lines [ J ]. Management Science, 1979, 25 ( 11 ) : 1105 - 1114.
  • 6Simaria A S, Vilarinho P M. A genetic algorithm based approach to mixed-model assembly line balancing problem of type II [ J ]. Computers and Industrial Engineering, 2004, 47 (4): 391-407.
  • 7宋华明,韩玉启.混合装配线上物料供应的平准化排序[J].系统工程,2002,20(3):15-19. 被引量:20
  • 8贾国柱.基于Petri网建模与仿真的制造企业生产系统流程再造方法[J].系统工程,2007,25(3):46-55. 被引量:11
  • 9Ramchandani C. Analysis of asynchronous concurrent sys- tem by timed petri Nets[ D]. Cambridge: MIT, 1974.
  • 10Zhao X B, Ohno K. Algorithm for sequencing mixed- models on an assembly line in a JIT production system [J]. Computers & Industrial Engineering, 1997, 32: 47 - 56.

二级参考文献19

  • 1蒋昌俊.加权T图的几种化简运算[J].通信学报,1994,15(2):97-103. 被引量:10
  • 2贾国柱,王峰.基于约束理论的生产系统再造方法[J].管理学报,2005,2(6):712-717. 被引量:9
  • 3刑文训.现代优化计算方法[M].北京:清华大学出版社,1999..
  • 4Martinsons M G,Hempel P S.Chinese business process reengineering[J].International Journal of Information management,1998,6:393-407.
  • 5Peterrson J.Petri net theory and the modeling of systems[M].Engle-Wood Cliffs,NJ:Prentic-hall,1981.
  • 6Murata T.Petri nets:properties analysis and applications[J].Proc of the IEEE,1989,77(4):153-159.
  • 7Karp R,Miller R.Parallel program schemata[J].J of comput & syst Sci,1969,3(4):25-43.
  • 8Finkel A.The minimal coverability graph for Petri nets[M].LNCS,1993,674:210-243.
  • 9Cheeung S C,Kramer J.Enhancing compositional realhability analysis with context constraints[J].ACMS of Tware Engineering Notes,1993,18(5):115-125.
  • 10Hitomi,Katsundo.Manufacturing system engineering[M].London:Taylor & Francis Ltd.,1996.

共引文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部