摘要
通过对某高速公路滑坡的预应力锚索轴力现场监测,分析了锚索预应力变化规律,预应力锚索轴力可分成三个阶段,分别为速损阶段、稳步下降阶段、基本稳定阶段。同时结合坡体坡面位移监测资料,分析得出在预应力锚索加固后,坡体变形逐渐趋缓。现场监测资料分析表明滑坡在经过加固处理后,整体已趋于稳定。
Based on the monitoring axial force of the pre-stressed cable on the highway landslide, the prestress change rule in cable is studied. The prestress loss can be divided into three phrase: speedy decline phrase, slow decline phrase and relatively stable phrase. In combination with the monitoring re- suits of displacements which are observed on slope surface, it is obtained that after reinforced, the dis- placement of slope can be reduced and will be stable. On-site monitoring results show that the whole landslide after reinforced is in stable condition.
出处
《低温建筑技术》
2011年第9期85-87,共3页
Low Temperature Architecture Technology
关键词
滑坡
锚索
预应力损失
坡面位移
landslide
cable
prestress loss
displacement of slope