摘要
阐述了柏叶口水库混凝土面板堆石坝大坝基础开挖,坝基开挖施工方法及施工过程的控制要点。
The paper expounds the excavation of dam base of concrete facing rockfill dam of Baiyekou Reservoir,introduces the construction method of excavation,and the main construction points in construction process.
出处
《山西水利科技》
2011年第3期7-8,共2页
Shanxi Hydrotechnics
关键词
混凝土面板堆石坝
坝基开挖
施工过程及控制
concrete facing rockfill dam
excavation of dam base
construction process and control