向家坝水电站混凝土重力坝施工方案比选 被引量:4

Selection and comparison of construction schemes of concrete gravity dam of Xiangjiaba Hydropower Station
在线阅读 下载PDF
导出
摘要 金沙江向家坝水电站大坝规模巨大,施工工期长,其合理的施工方案是大坝快速施工的关键,直接关系到工程的工期和投资。根据工程地质地形条件和枢纽结构布置,拟定了多种大坝混凝土施工方案,对不同的方案进行比较,提出采用3台30 t平移式缆机+3台塔带机配适量门塔机的施工方案。通过按不同的大坝分缝方案和浇筑层厚对推荐方案进行计算机仿真,仿真计算结果表明所选施工方案是可行的、合理的,对其他类似工程也有借鉴意义。 Xiangjiaba Hydropower Station is characterized as large scale,long construction period,so the reasonable construction scheme is the key to the quick construction of the dam,which directly related to the construction period and investment.According to the engineering geology and terrain condition and layout and structure of the complex,several construction schemes of concrete dam were studied out and compared.The scheme of adopting 3 translation cable cranes(30 t) and 3 tower belt cranes with proper portal cranes was put forward.The recommended scheme was simulated in the cases of different joint layouts and concrete lift thickness by computers.The results showed that the recommended scheme was reasonable and feasible and can be referred by other similar projects.
作者 杨学红
出处 《人民长江》 北大核心 2011年第16期25-28,共4页 Yangtze River
关键词 施工方案 施工仿真 混凝土施工 向家坝水电站 construction scheme construction simulation concrete construction Xiangjiaba Hydropower Station
  • 相关文献

同被引文献17

引证文献4

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部