期刊文献+

基于机会约束规划的生产全过程实时优化

Real-Time Optimization Based on Chance-Constrained Programming for Plant-Wide Processes
在线阅读 下载PDF
导出
摘要 针对一类生产全过程,提出了基于机会约束规划的动态实时优化策略.基于产品质量优化模型,利用机会约束规划,将实时优化问题中的经济和模型不确定约束以一定的置信水平概率满足,通过求解联合概率约束问题,确定各子过程控制器的最优设定值.通过步进式加热炉炉温设定值优化问题的仿真研究,验证了该方法的有效性和实用性. A dynamic real-time optimization(RTO) scheme based on chance-constrained programming(CCP) was presented for a class of plant-wide processes.Chance-constrained programming is employed in the optimization problem,in which the constraints containing economic and model uncertainties are guaranteed to be satisfied at a high level of probability.The real-time optimizer based on product quality model determines the optimal setpoint for each sub-process by solving joint probability constrained problem.Simulation studies for furnace temperature setpoints optimization problem of the walking beam reheating furnace were illustrated to verify the effectiveness and practicality of the proposed method.
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2011年第7期975-979,984,共6页 Journal of Shanghai Jiaotong University
基金 上海市教委科研创新项目(09YZ241) 国家自然科学基金资助项目(60804033) 上海市教委重点学科建设项目(J50602)
关键词 实时优化 生产全过程 机会约束规划 步进式加热炉 real-time optimization(RTO) plant-wide processes chance-constrained programming(CCP) walking beam reheating furnace
  • 相关文献

参考文献1

二级参考文献3

  • 1张忠怀,杨惠卿.电阻炉(自然对流式)的数学模型[J]信息与控制,1986(06).
  • 2林来兴.热工调节对象动态特性综述[J]自动化学报,1965(01).
  • 3[美]欣斯基(F·G· Shinskey) 著,方崇智.过程控制系统[M]化学工业出版社,1982.

共引文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部