摘要
以宁杭城际轨道交通项目江苏省段为例,对高速铁路临时用地土地破坏类型、预防控制措施等进行了研究,以期提供借鉴。
Taking the project of Nanjing-Hangzhou Intercity Railway as an example,this paper researches the types of the land damage in temporary site of high-speed railway construction and the measures for preventing and controlling the land damage for providing some references.
出处
《科技情报开发与经济》
2011年第19期190-192,200,共4页
Sci-Tech Information Development & Economy
关键词
高速铁路
临时用地
土地破坏
预防措施
high-speed railway
temporary site of construction
land damage
precautionary measure