大涝坝1号构造注水开发地面工艺流程优化 被引量:3

Optimization of Surface Technological Process for Water-injectionDevelopment of Dalaoba No.1 Structure
原文传递
导出
摘要 大涝坝1号构造DLK8井注水开发,原地面工艺注水流程存在注水压力高、注水回流量大、撬块震动较大等问题。通过调整柱塞大小、流程优化等经济可行的对策,解决了回流量大、撬块震动过大问题,提高了注水水质,起到了节电增油的效果。为边远井撬装注水流程的开发建设提供了借鉴和参考。 The well DLK8 in Dalaoba No.1 structure is developed by water injection. The former surface technological process has some problems such as high water-injection pressure, large water-injection backflow and big shake of base. The problems are analyzed and resolved by regulating the size of plunger and optimizing the process, and the quantity of water injection is improved for saving electronic energy and increasing oil production. The results provide some references for the development of other remote well blocks.
出处 《吐哈油气》 2011年第2期153-155,共3页 Tuha Oil & Gas
关键词 注水开发 柱塞优化 流程优化 节电增油 water-injection development plunger optimization flow optimization electricity saving and oil production increase
  • 相关文献

参考文献4

共引文献15

同被引文献31

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部