期刊文献+

汤旺河干流伊春红山水电站坝址段水生生物调查与评价

Currant Status Investigation and Assessment on Aquatic Organism Near Yichun Hongshan Hydroelectric Power Station Damin the Mainstream of Tangwang River
在线阅读 下载PDF
导出
摘要 在伊春红山水电站枢纽工程建设前对汤旺河干流红山电站坝址段(上甘岭河段),即淹没区上游、淹没区和坝区以及坝区下水生生物进行实地监测调查,并根据调查结果对项目区河段水生生物现状进行评价,为项目建设的环境影响提供基础数据。 Before constructing the key project of Yichun Hongshan Hydroelectric Power Station,the aquatic organisms in the Tangwang River mainstream near Yichun Hongshan Hydroelectric Power Station Dam(Shangganling River section) was monitored and investigated,that is upper stream of the submerged area,the submerged area,the dam area as well as under the dam area.Based on the investigation results,the present status of aquatic organisms in the project section of the river was assessed,which provides essential data for environmental impacts of the project.
作者 刘晓兰
出处 《环境科学与管理》 CAS 2011年第6期129-132,共4页 Environmental Science and Management
关键词 汤旺河干流 水电站 水生生物 现状调查与评价 mainstream of Tangwang River hydroelectric power station aquatic organism investigation and assessment on present status
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部