文章结合季节冻胀区长吉城际铁路客运专线高性能混凝土低温期施工的特点,从混凝土配制、搅拌、运输、浇筑和养护等环节采取相应的施工质量控制技术措施,为同类工程建设提供参考。
Changji railway passenger special line use high performance concrete to construct during low temperature period in frost boils area.The article discusses corresponding con-struction quality control measures from the perspective of concrete formulating,mixing,transporting,pouring and maintenance.This provides reference for related construction project.