期刊文献+

变电站综合自动化系统上位机监控功能实现探讨 被引量:5

The implementation of monitoring In Integrated automatic system for BZZ transformer subststations
在线阅读 下载PDF
导出
摘要 本文以BZZ型变电站综合自动化系统为背景,论述其上位机软件的实现。主要包括为实现监控而采用的组态技术、双机冗余热备份、实时多任务的管理以及整个系统的通讯实现,并且指出了进一步完善系统的方向──用案例推理辅助诊断系统的故障。 The paper presented here is based on the integrated automatic system for BZZ transformer substation. We mainly concern the implementation of software on main control machine in this paper. Some key techniques including control configuring. dual -machine redundancy backup. real time multitasks management and communication are discussed.Moreover, a direction that can make this system more perfect is given, which is diagnosis of system malfunctions with Case-Based Reasoning.
出处 《微计算机信息》 1999年第4期50-52,共3页 Control & Automation
关键词 变电站 综合自动化系统 上位机 监控 电力系统 Integrated automation of transformer substations,Main control machines,Configuration,R edundancy backup,Real time multitasks,Communica tion,Case-Based Reasoning
  • 相关文献

同被引文献9

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部