摘要
水利水电工程移民安置人口包括生产安置人口和搬迁安置人口,二者具有不同的属性和概念,通过分析二者之间的关系,提出了一种较为通用的计算方法,避免出现重复计算,在实际工作中可参考采用。
The resettlement population for construction of water conservancy and hydropower projects can be divided into two groups: production resettlement population and emigration resettlement population. These two groups are different in attributes and concepts. This paper explores the relationships between the two groups and proposes a general calculation method to avoid double counting.
出处
《电网与清洁能源》
2011年第4期80-82,共3页
Power System and Clean Energy
关键词
移民安置
生产安置人口
搬迁安置人口
resettlement of affected people
production resettlement population
emigration population for resettlement