摘要
城市道路横断面布置不仅涉及机动车道、非机动车道、人行道和绿化带的宽度,而且与地下综合管线布置有着密切的关系。该文依据国家相关规范,阐述了如何在满足车辆和行人通行的情况下,充分利用有限的地下空间资源,合理布置地下综合管线,探讨了道路横断面设计与综合管线布置的关系。
The cross section layout of urban road is not only involved with the widths of motored vehicle lane,non-motored vehicle lane,sidewalk and greening belt,is but also closely related with the layout of the underground engineering tunnel.Based on the national relative criterions,the article sets forth how to fully utilize the limited underground space resource and reasonably layout the underground engineering tunnel under the condition to satisfy the traffic of vehicles and passengers,and discusses the relation between the cross section design of road and the layout of engineering tunnel.
出处
《城市道桥与防洪》
2011年第4期55-57,12,共3页
Urban Roads Bridges & Flood Control
关键词
城市道路
横断面设计
综合管线
urban road,design of cross section,engineering tunnel