申村水库大坝除险加固工程设计 被引量:6

Design for Reinforcement Project of Shencun Reservoir Dam
在线阅读 下载PDF
导出
摘要 根据申村水库的工程地质条件,水库枢纽存在的问题,通过对不同除险加固工程设计方案的比选,确定除险加固最优方案,即采用泄洪洞方案(溢洪道规模维持现状,拆除原坝下涵管,在原坝下涵管位置新建泄洪洞)。同时,对水库主坝和副坝分别进行了除险加固设计,并对主副坝渗流和稳定进行复核,计算表明,坝体各分区及坝基的渗透稳定、坝坡稳定均能满足要求。综合分析,论证了设计的合理性。 Based on the geological conditions and existing problems of Shencun Reservoir Hub Project,the different reinforcement design plans are compared here to obtain the best plan,which is to build a new spillway tunnel in the original culvert position.Meanwhile,the reinforcement designs are made for the reservoir dam and assistant dam separately,and the seepage and stability conditions of the dam are re-checked.The results show that the seepage stability of each division and foundation of the dam and the stability of the dam slope could meet the requirements.So,the rationality of the design is demonstrated through comprehensive analyses.
作者 孛永平 甘磊
出处 《水利与建筑工程学报》 2011年第2期80-84,共5页 Journal of Water Resources and Architectural Engineering
关键词 大坝 除险加固 设计 渗流 稳定 dam reinforcement design seepage stability
  • 相关文献

参考文献8

二级参考文献9

共引文献12

同被引文献35

引证文献6

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部