期刊文献+

系杆拱桥半刚性吊杆初始张拉力分析与测定 被引量:2

Analysis and Measurement of Initial Tensioning Force in Semirigid Hangers for Tied-Arch Bridge
在线阅读 下载PDF
导出
摘要 吊杆初始张拉力的确定是系杆拱桥施工过程中的关键问题。而在吊索外增加钢套管保护,则会给施工过程中索力的测量造成较大困难。结合一座钢管混凝土系杆拱桥,对外带钢套管的半刚性吊杆初始张拉力进行了优化分析和计算,并提出一种半刚性吊杆索力测量方法。通过在苏州市兴贤大桥施工监控过程中的应用,证明该测量方法方便、适用,可为同类工程提供一定的借鉴。 The determination of the initial tensioning force in bangers is vital in the building of the tied-arc bridge. If the steel tube is applied in the outer banger for protection, it will be more difficult to measure the initial tensioning force of hangers in the construction of the tied-arc bridge. In this paper, based on a concrete filled steel tube arch-tied bridge, the initial tensioning force in hangers is optimized and calculated, and a method for measuring the tensioning force in the semirigid hangers is proposed. The application of the method in the construction and monitoring of the Xing-xian Bridge in Suzhou indicates that the measurement is convenient, practical, so that it can provide some help for the proiect of the kind.
出处 《苏州科技学院学报(工程技术版)》 CAS 2011年第1期37-40,共4页 Journal of Suzhou University of Science and Technology (Engineering and Technology)
关键词 系杆拱桥 吊杆 张拉力 索力测量 tied-arch bridge hanger tensioning force
  • 相关文献

参考文献5

二级参考文献12

共引文献67

同被引文献15

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部