摘要
大庆油田首次三元复合驱矿场试验研究表明,三元复合驱使区块综合含水由88.4%下降至63.7%,区块日产油量由见效前的37t上升到最高值88t,全区累积增油19625t,中心井比水驱提高采收率21.0%;大幅度节省了注水量,提高了开采速度;扩大了波及体积,改善了动用状况,提高了驱油效率。分析发现,三元复合驱注入压力上升幅度、视吸水指数下降幅度及比产液指数下降幅度都小于聚合物驱;三元复合体系与油层及流体有较好的配伍性,不会造成对油层的伤害。
It is shown by the first ASP flooding field test in Daqing
oilfield that the total water cut in the test block can be reduced from 88.4% to 63.7%, oil
production increased from 37t/d to 88t/d, total oilincrement is 19625t; The oil recovery in the
center well is enhanced by 21.0%; A great deal of injection water is saved, the oil production
rate is increased, the sweep volume is enlarged, the producing performance is improved, and
the oildisplacement efficiency is enhanced. The pressure raising scope , the apparent
injectivity index declining scope and the liquidproduction intensity declining scope for ASP
flooding are less than those of polymer flooding. The ASP system matches well with the
formation water and the formation can not be damaged. The field test reveal a good prospect for
Daqing oilfield to develop ASP flooding.