摘要 结合瓶窑变电站实际,对超高压故障电流限制器示范工程中的2种设备布置方案进行了分析,从经济性、可靠性、停电时间、实施难度等方面进行了比较,最后给出推荐方案。 This paper attempts to make practical analysis and comparison between the two equipment layout designs for the demonstration project of EHV Grid Fault Current Limiter at Pingyao substation,with focus on economy,reliability,interruption time,implementation difficulty.Accordingly,the optimal scheme is recommended.
作者 季方 钱锋
出处 《华东电力》 北大核心 2011年第4期597-599,共3页 East China Electric Power
关键词 故障电流限制器 布置方案 技术经济比较 fault current limiter layout design technical and economic comparison
  • 相关文献

参考文献3

二级参考文献5

  • 1殷可,高凯.应用串联电抗器限制500kV短路电流分析[J].华东电力,2004,32(9):7-10. 被引量:40
  • 2Australasia news: ABB installs its largest series reactor at TransGrid's Sydney South 330 kV Substation
  • 3SCCL-Short-Circuit Current Limitation with FACTS in High Voltage Systems: Application & Features_V2 PTD H 16-H 1PD/Re
  • 4Accepted Bulk Power Series Reactor Applications on the PJM System.
  • 5Con Edison. System Fault Current Management Plan. Presentation to The NYISO Operation Committee, June 20, 2001.

共引文献88

同被引文献30

引证文献3

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部