摘要 深圳大运中心体育场钢屋盖采用单层折面空间网格结构,悬挑跨度51.9m到68.4m,与混凝土看台完全脱开,依靠20个球铰支座,支承在标高6m的混凝土平台处,边界约束少、传力路径复杂、整体稳定问题突出。依据特征值屈曲分析确立了初始几何缺陷的不利分布,利用非线性有限元系统分析了结构整体稳定性能,并研究了关键部位、重要杆件对整体稳定性能的影响。分析结果表明:体育场钢结构属于缺陷不敏感结构;在最不利竖向与水平风荷载组合工况下,考虑几何非线性、材料非线性双重非线性效应,结构整体稳定系数接近3,结构具有较好的整体稳定性能,即使缺失关键部位和重要杆件,也不会发生连续倒塌,证实了该结构体系可行、安全可靠。 A type of structural system named as single-layer folded-plane latticed shell structure was adopted in the steel roof of main stadium of the Shenzhen Universiade Sports Center.The cantilevered span of the steel roof ranges between 51.9m and 68.4m.The steel roof was separated from the concrete grandstand completely and supported in a concrete platform by 20 ball joints.Characteristics of this structure were few border constraints,complicated load path and uncertainty of overall stability.The deformation shape due to initial geometric defect was found by characteristic buckling analysis.Then the overall stability was analyzed by nonlinear method.The influence of key positions and important bars to the overall stability was also studied.The results show that the steel roof is insensitive to initial geometric defect.The overall stability coefficient is close to 3,under the most unfavorable load combination of wind loads in both vertical and horizontal directions and considering both geometric nonlinearity and material nonlinearity.The structure has good overall stability.The progressive collapse will not occur even if the critical and important bars were lost.This structural system is feasible,safe and reliable.
出处 《建筑结构学报》 EI CAS CSCD 北大核心 2011年第5期56-62,共7页 Journal of Building Structures
关键词 单层折面空间网格结构 有限元分析 整体稳定 连续倒塌 single-layer folded-plane latticed shell structure FEA overall stability progressive collapse
  • 相关文献

参考文献6

二级参考文献18

  • 1赵阳,陈贤川,董石麟.大跨椭球面圆形钢拱结构的强度及稳定性分析[J].土木工程学报,2005,38(5):15-23. 被引量:23
  • 2张爱林,刘学春,葛家琪,张宝勤,张晓峰.2008年奥运会羽毛球馆预应力张弦穹顶结构整体稳定分析[J].工业建筑,2007,37(1):8-11. 被引量:21
  • 3张爱林,刘学春.奥运羽毛球馆张弦穹顶基于整体稳定的优化设计[J].建筑结构,2007,37(2):1-5. 被引量:25
  • 4GB50009-2001,建筑结构荷载规范[S].2006.
  • 5CECS235:2008铸钢节点应用技术规程[S].
  • 6同济大学土木工程防灾国家重点实验室.世博轴及地下综合体工程抗风研究风洞试验和响应计算报告[R].上海:同济大学,2007.
  • 7沈祖炎,苏慈,罗永峰.空间钢结构的极限承载力研究[C]//第四届海峡两岸结构与岩土工程学术研讨会论文集.杭州:浙江大学出版社,2007:134-145.
  • 8北京市建筑工程研究院.深圳大运中心主体育场卸载过程监测报告[R].北京:北京市建筑工程研究院,2010.
  • 9广东省建筑科学研究院.深圳大运中心体育场风荷载研究报告[R].广州:广东省建筑科学研究院,2007.
  • 10深圳地质建设工程公司.深圳奥林匹克体育中心工程场地地震安全性评价报告[R].深圳:深圳地质建设工程公司,2006.

共引文献2240

同被引文献124

引证文献16

二级引证文献52

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部