摘要
介绍在软土地基中施工沉井时为防止突沉和超沉而采取的措施以及纠偏与位移的关系。
This article introduces the measures taken against the sudden settlement or over settlement when constructing sunk wells in soft grounds.The relationship between deviation rectifying and the displacement is also presented here.
出处
《施工技术》
CAS
北大核心
1999年第9期34-35,共2页
Construction Technology
关键词
沉井
施工方法
环梁
厂房建筑
软土地基
Sunk well
Construction method
Deviation rectifying
Ring beam
Cruciform beam
Industrial building