期刊文献+

南昌轨道交通1号线过江隧道盾构施工方案比选 被引量:3

Comparison and Selection of Shield Construction Schemes for River Crossing Tunnel in Nanchang Rail Transit Line One
在线阅读 下载PDF
导出
摘要 盾构的性能及其与地质条件、工程条件的适应性是盾构隧道施工成败的关键,因此采用盾构法施工就必须选择最佳的盾构施工参数和最适宜的盾构。结合工程特点,对2种盾构机的优劣和适应性进行了综合分析和比较,并提出推荐建议。 Shield' s properties and its adaptability with the geological conditions and the engineering conditions are the key factors determining the success of shield tunnel construction. Therefore, optimal shield construction parameters and suitable shields must be chosen in construction with the shield tunneling method. Combined with the project characteristics, this paper makes comprehensive analysis and comparisons between the advantages, disadvantages and adaptability of two kinds of shield machine, and puts forward some suggestions.
作者 余界明
出处 《铁道建筑技术》 2011年第3期37-40,52,共5页 Railway Construction Technology
关键词 区间隧道 盾构 土压平衡 泥水平衡 比选 running tunnel shield earth pressure balance sludge-liquid balance compare and select
  • 相关文献

参考文献2

  • 1杨我清 张凤祥.隧道工法与工程地质条件的关系.上海隧道,1995,(4).
  • 2[日]土木学会著,朱伟译.隧道标准规范(盾构篇)及解说[M].北京:中国建筑工业出版社,2001

共引文献1

同被引文献7

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部