引黄入晋工程南干线一级泵站进水系统优化研究 被引量:1

Optimization study for water incoming system of SM first stage Station of the Yellow River Diversion Project
在线阅读 下载PDF
导出
摘要 引黄入晋工程南干线一级泵站上游来水需经90°转弯进入侧向引水泵站进水池,弯道水流对进水池内水流流态影响很大。在来水角度不能改变的情况下, 通过不同运用工况试验研究, 提出在弯道右侧墙设置带缺口的导流齿,是改善弯道流态、保持进水池水面平静的有效途径。提供的最终体型及该体型下机组运行的最低限制水位, 已被设计部门采纳并实施。 Upstream incoming water of SM first stage station of the Yelloow River Diversion Project will enter the side diversion inlet pool of the pumping station through 90° bending. The bending stream will seriously influence the flow condition in the inlet pool. On condition that incoming angle cannot be changed, by means of the test study under the various operating conditions, it is undertaken that setting flow guiding tooth at the right side of the bend will be a active way through which the flow condition in the inlet pool will be improved and the water surface in the inlet pool will be kept calm. The supplied final type of build and the minimum. limited operating level of the pumping unit under the type of build have been adopted by the design department and put into effect.
作者 李善岩
出处 《水利水电工程设计》 1999年第3期20-21,23,共3页 Design of Water Resources & Hydroelectric Engineering
关键词 泵站 弯道 掺气漏斗 导流齿 引黄入晋 进水系统 pumping station, side diversion inlet pool, bend, air mixing funnel, flow guiding teeth
  • 相关文献

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部