综采工作面过断层群开采关键工艺技术实践 被引量:9

Practice of Through Fault in Fully-Mechanized Working Face
在线阅读 下载PDF
导出
摘要 大采高综采工作面开采过程中揭露断层(群),将极大影响工作面推进速度与安全。以宁煤集团清水营煤矿110202工作面为背景,在现场工程地质调查的基础上,掌握了工作面断层群的产状,并分析了可能对工作面开采带来的影响。通过制定工作面超前探放水工艺、上/下出口超前加固工艺、调伪斜工艺、强制放顶工艺,以及开采过程中调整工作面底板坡度等措施,顺利保证了过断层群期间工作面的回采安全。通过对消耗材料统计和安全效益评估,证明该成套(关键)工艺的实施,在合理经济投入下保证了工作面的安全,安全效益显著。该技术对宁东矿区类似条件下工作面过断层开采提供了技术和经验借鉴。 High seam mining face exposed during the mining of fault ( s), will greatly affect the working face advancing speed and security. Ning Coal Mine to 110,202 face water business background of engineering geological investigation at the scene, based on the group mastered the working face fault occurrence, and to analyze the possible impact on the working face. Face drainage through the development of advanced exploration technology, up / down ahead of strengthening export of technology, technology transfer oblique, caving techniques, and adjusted during the mining face floor slope and other measures to ensure the fault of the smooth face during the recovery group security. Statistics on consumption of materials and safety benefit assessment to prove that the sets (key) process implemented in a reasonable economic investment to guarantee the safety of the working face, a significant safety benefit. Mining Area of the technology rather than face under similar fault mining technology and experience to provide a reference.
出处 《煤》 2011年第3期13-16,共4页 Coal
关键词 综采工作面 断层群 探放水 fully-mechanized mining face fault group drilling escape
  • 相关文献

参考文献6

二级参考文献13

  • 1赵庆彪,侯朝炯,马念杰.煤巷锚杆-锚索支护互补原理及其设计方法[J].中国矿业大学学报,2005,34(4):490-493. 被引量:85
  • 2朱永建,马念杰.基于松动圈围岩分类法煤帮锚杆支护设计[J].煤炭科学技术,2006,34(7):30-33. 被引量:21
  • 3来兴平.开采扰动下大尺度采空区衍生动力灾害控制研究[R].北京:北京科技大学,2004.
  • 4Hebblewhite B K, Lu T. Geomechanical behaviour of laminated, weak coal mine roof strata and the implications for a ground reinforcement strategy [J]. International Journal of Rock Mechanics and Mining Sciences, 2004, 41 ( 1 ) : 147.
  • 5C Chunlin Li. Rock support design based on the concept of pressure arch [J]. International Journal of Rock Mechanics and Mining Science, 2006, 43 (7) : 1 083.
  • 6Moosavi M, Grayeli R. A model for cable bolt-rock mass interaction: Integration with discontinuous deformation analysis (DDA) algorithm [J]. International Journal of Rock mechanics and Mining Science, 2006, 43 (4) : 661.
  • 7Goel R K, Anil Swarup, Sheorey P R. Bolt length requirement in underground openings [J]. International Journal of Rock Mechanics and Mining Sciences, 2007, 44 (5) : 802.
  • 8Liu B, Yue Z Q, Tham L G. Analytical design method for a truss-bolt system for reinforcement of fractured coal mine roofsillustrated with a case study [J]. International Journal of Rock Mechanics and Mining Sciences, 2005, 42 (2) : 195.
  • 9Unal E, Ozkan I, Cakmakci G. Modeling the behavior of longwall coal mine gate roadways subjected to dynamic loading [J]. International Journal of Rock Mechanics and Mining Sciences, 2001, 38 (2) : 181.
  • 10Butt S D, Mukherjee C, Lebans G. Evaluation of acoustic attenuation as an indicator of roof stability in advancing headings [ J]. International Journal of Rock Mechanics and Mining Science, 2000, 37 (7) : 1 123.

共引文献46

同被引文献28

引证文献9

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部