摘要
通过对上海地区电负荷增长的预测和用电峰谷差对新建机组调峰能力要求的分析,论述了在未来上海发电领域中建设燃气轮机调峰电站的必要性。图1
The growth of electric power load in Shanghai area is predicted and the requirement for the cycling capability of newly built units to follow up the load change is analyzed in this paper.The neccessity to build gas turbine based cycling power plants in Shanghai power generation sector in future is described.
出处
《动力工程》
CSCD
1999年第6期415-418,共4页
Power Engineering
关键词
燃气轮机
发电
负荷预测
调峰
gas turbine
power generation
load forecast
peak shaving