摘要
根据左江水利枢纽工程泄水建筑物体型优化研究成果[1],对坝趾消能工提出了优化的消能方式,减少了溢流坝消能工的工程量.同时在水流条件方面,论证了坝趾消能墩使用的可行性.
According to the result of optimum researching on Zuojian hydroproject sluice structure type,this paper has put forward using the toe energy dissipator to reduce the quantity of spillwag dam energy dissipator.Furthermore,this paper has expounded and proved the feasibility of using the toe energy dissipation pier in the condition of flow.
出处
《广西大学学报(自然科学版)》
CAS
CSCD
1999年第3期248-251,共4页
Journal of Guangxi University(Natural Science Edition)
关键词
消能工
流态流速
流速
冲坑
水利枢纽
坝趾
energy dissipator
flow pattern
flow velosity
wave
scour hole