摘要
以某穿越海堤水平平行顶管工程为例,在施工方案优化分析的基础上,详细地介绍复杂地质条件下长距离大直径水平平行顶管施工技术,并对顶管施工引起的地层变形进行现场监测与分析,提出顶管顶进施工过程中土体扰动特性的变化规律。保证了施工安全与顺利进行,并提出相应的变形控制措施。
The construction technology for level parallel long-distance large-diameter pipe jacking under complex geotechnical conditions are descried in detail after optimization analysis of the construction scheme,with a level parallel pipe jacking project as an example.The monitoring results of the deformation of the stratum caused by the pipe jacking construction are analyzed.The characteristics of the stratum disturbance during the crossing process is provided.Some countermeasures to control the deformation are recommended and the construction safety is quaranteed.
出处
《隧道建设》
2011年第1期110-113,120,共5页
Tunnel Construction
关键词
大直径
水平平行顶管
穿堤
堤身变形监测
堤身变形控制
large diameter
level parallel pipe-jacking
crossing embankment
embankment deformation monitoring
embankment deformation control