期刊文献+

基于CMI的废旧轮胎回收系统多周期LRIP 被引量:1

Multi-period location-routing-inventory problem based on collector managed inventory in scrap tires recycling systems
在线阅读 下载PDF
导出
摘要 为提高废旧轮胎回收的效率和效益,针对废旧轮胎规范化回收系统优化问题,建立了一种基于回收商管理库存方式的多周期定位-路径-库存问题优化模型,并据此进行回收中心开设地点选择、收集车辆路径安排以及回收点与回收中心的两级库存控制的联合优化决策。设计了一种两阶段启发式算法:阶段1采用先定位-分配,后安排车辆路径和库存的方法,基于系统总成本最小求得初始解;阶段2采用改进启发式搜索方法搜寻更优解。示例分析结果表明了该模型和算法的有效性,并证明了回收商管理库存方式可以显著提高废旧轮胎回收系统的运营绩效。 To improve the efficiency and effectiveness of recycling scrap tires,the optimization of standardized recycling systems for scrap tires was studied.A multi-period optimization model for Location-Routing-Inventory Problem(LRIP) based on Collector Managed Inventory(CMI) was developed.Accordingly,the joint optimal decision of locating recycle centers,scheduling routes of collection vehicles,and controlling the two-echelon inventory at recycle centers and collection sites can be made.A two-phase heuristic algorithm was proposed.The initial solution was found by using location-allocation first,route and inventory second approach based on minimal system cost in phase 1.An improvement heuristic search for a better solution based on the initial solution in phase 1 was developed in phase 2.A numerical example results showed that the proposed model and algorithm was valid and CMI-based approach can significantly improve the operating performance of recycling systems for scrap tires.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2011年第2期397-403,共7页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(70502025)~~
关键词 废旧轮胎 回收系统 定位-路径-库存问题 启发式算法 回收商管理库存 scrap tires recycling system location-routing-inventory problem heuristic algorithms collector managed inventory
  • 相关文献

参考文献8

  • 1李如林.我国废旧轮胎回收利用行业的现状及发展对策[J].中国资源综合利用,2003,21(3):3-6. 被引量:35
  • 2LIU S C,LEE S B.A two-phase heuristic method for the multi-depot location routing problem taking inventory control decisions into consideration[J].The International Journal of Advanced Manufacturing Technology,2003,22 (11/12):941-950.
  • 3LIU S C,LIN C C.A heuristic method for the combined location routing and inventory problem[J].The International Journal of Advanced Manufacturing Technology,2005,26 (4):372-381.
  • 4崔广彬,李一军.基于双层规划的物流系统集成定位-运输路线安排-库存问题研究[J].系统工程理论与实践,2007,27(6):49-55. 被引量:30
  • 5崔广彬,李一军.模糊需求下物流系统CLRIP问题研究[J].控制与决策,2007,22(9):1000-1004. 被引量:19
  • 6LI Huajun,MA Zujun.The stochastic location-routing-inventory problem in reverse logistics systems for municipal solid waste[C] //Logistics:The Emerging Frontiers of Transportation and Development in China.Reston,Va.,USA:ASCE,2008:3565-3571.
  • 7WANG Chanchan,MA Zujun.Stochastic dynamic locationrouting-inventory problem in closed-loop logistics system for reusing end-of-use products[C] //Proceedings of the 2008 International Conference on Intelligent Computation Technology and Automation.Washington,D.C.,USA:IEEE,2008,2:691-695.
  • 8LE BLANC H M,VAN KRIEKEN M G C,FLEUREN H A,et al.Collector managed inventory:a proactive planning approach to the collection of liquids coming from end-of-life vehicles[R].Tilburg,The Netherlands:Tilburg University,DOI:10.2139/ssrn.557763.

二级参考文献23

  • 1Perl J,Daskin MS.A warehouse location-routing problem[J].Transportation Research Quarterly,1985,19B(5):381-396.
  • 2Srivastava R.Alternate solution procedures for the location-routing problem[J].Omega,1993,21(4):497-506.
  • 3Dilek Tuzun,Laura I.Burke.A two-phase tabu search approach to the location routing problem[J].European Journal of Operational Research,1999,116 (1):87-99.
  • 4Tai-His Wu,Chinyao Low,Jiunn-Wei Bai.Heuristic solution to multi-depot location-routing problems[J].Computers and Operation Research,2002,29(10):1393-1415.
  • 5Daskin M S.Logistics:An overview of the state of the art and perspectives on future research[J].Transportation Research,1985,19A(5/6):383-398.
  • 6Hokey Min,Vaidyanathan Jayaraman,Rajesh Srivastava.Combined location-routing problems:A synthesis and future research directions[J].European Journal of Operational Research,1998,108(1):1-15.
  • 7Perl J,Sirisoponsilps.Distribution networks:Facility location,transportation and inventory[J].International Journal of Physical Distribution and Material Management,1988,18(6):18-26.
  • 8Lenstra J K,Rinnooy Kan A H G.Complexity of vehicle routing and scheduling problems,1981,11(2):221-227.
  • 9Liu S C,Lee S B.A two-phase heuristic method for the multi-depot location-routing problem taking inventory control decisions into consideration[J].The International Journal of Advanced Manufacturing Technology,2003,22(11-12):941-950.
  • 10Lin S C,Lin C C.A heuristic method for the combined location routing and inventory problem[J].The International Journal of Advanced Manufacturing Technology,2005,26(4):372-381.

共引文献76

同被引文献35

引证文献1

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部