郑州黄河公铁两用桥运用梁模一体的新型移动模架进行铁路箱梁的施工,此种模架充分利用了该桥构件的承载能力,具有工序简单,机械化程度高,受力明确,安全系数大等特点。介绍了该模架的设计原理及设计过程。对设计和建造好的移动模架进行了现场拼装和预压,预压结果满足规范要求。同时还介绍了该桥的具体施工工艺。利用该移动模架成功进行了铁路箱梁的施工。
A new kind of movable scaffolding system(MSS) is adopted for construction of the box girder in highway and railway combined bridge of the Yellow River in Zhengzhou.The MSS uses fully load capacity of members of the bridge,and has some characteristics of easy construction method,high mechanization,specific load transfer road and safety.The author shows design theory and design procedure of the MSS.Assembly and pre-loading test on site are done for MSS which has been designed and prefabricated,and the test result satisfies requirement of code.The author also introduces the actual construction technologies.The construction of the box girder is fulfilled successfully with the MSS.
出处
《施工技术》
CAS
北大核心
2011年第2期18-22,共5页
Construction Technology
关键词
桥梁工程
移动模架造桥机
箱梁
设计
施工工艺
bridge engineering
movable scaffolding system(MSS)
box girder
design
construction technology