摘要
针对多富水层和多流砂层的复杂水文地质条件,提出大断面立井综合防治水技术:表土层和风化基岩段采用冻结法施工,富水层段采用复合井壁和工作面预注浆技术,最后对井筒集中出水区域壁后、壁间注浆和全井筒分区域整体注浆。实践表明,取得了较好的封水效果。
According to the complex hydrogeology conditions with many rich water seams,and many flow sand seams,comprehensive water control of large section vertical shaft is putted forward:the first is by using freezing construction method in surface soil seam and weathering bedrock seam,the second is by using composite shaft lining and face pre-grouting to control water,the last is by wall back and intramural grouting and whole shaft grouting.The practice shows that it obtained a good sealing effect of water.
出处
《中国煤炭》
北大核心
2011年第2期56-58,共3页
China Coal
关键词
大断面立井
复杂水文地质
井筒施工
冻结法
复合井壁
工作面预注浆
large section vertical shaft
complex hydrogeology conditions
shaft sinking and drifting
freezing method
composite shaft lining
face pre-grouting