期刊文献+

基于广佛线调制浆系统在泥水盾构施工中的应用 被引量:1

Application of Slurry Mixing System in Slurry Shield Tunneling of Guangzhou-Foshan Metro
在线阅读 下载PDF
导出
摘要 以广佛线城际轨道交通为背景,详细论述了泥水盾构在施工过程中泥膜形成的过程,以及泥膜对盾构推进的重要作用,并根据泥膜加压试验得到了实际工程中泥膜的特性。研究表明,施工中的调制浆系统所调制的浆液的特性是决定泥膜形成速度和泥膜质量的关键,也是决定泥水盾构推进的至关重要的因素。广佛线泥水调制浆系统的施工组织与安排,为类似以砂土为主要结构土层的盾构施工提供了实践经验。 Focusing on Guangzhou-Foshan urban rail transit,this thesis describes the process of mud film formation in slurry shield tunneling and the important function of mud film in shield driving.The characteristics of mixed slurry are the key factors affecting the velocity of mud film formation and the quality of mud film as well as the shield driving.Characteristics of mud film in the actual construction were obtained by the compression test of mud films.Successful experience of construction organization of slurry system in Guangzhou-Foshan metro can be taken for reference by similar projects.
出处 《现代隧道技术》 EI 北大核心 2011年第1期153-159,共7页 Modern Tunnelling Technology
关键词 泥水盾构 调制浆系统 泥膜 地铁隧道 Slurry shield Slurry mixing system Mud film
  • 相关文献

参考文献3

二级参考文献6

  • 1项兆池,楼如岳,傅德明.最新泥水盾构技术[M].上海:上海隧道工程股份有限公司施工技术研究所科技情报室,2001.
  • 2Muller-Kirchenbauer,H.1977.Stability of slurry trenches in inhomogeneous subsoil.In N.N.(ed),9th International Conference on Soil Mechanics and Foundation Engineering,pp.125-132.
  • 3Anagnostou G,Kovari K.The face stability of slurryshield-driven tunnels[J].Tunneling and Underground Space Technology.1994,Vol.9,No.2 pp165-174.
  • 4Kanayasu S,Kubota I,and Shikibu N.Stability of face during shield tunneling-A survey of Japanese shield tunneling.Fujita and Kusakabe,editors.Underground Construction in Soft Ground[M].1995 319-322.
  • 5邓忠义.泥水平衡开挖面稳定性研究[硕士论文D].上海:同济大学,2005.
  • 6程展林,吴忠明,徐言勇.砂基中泥浆盾构法隧道施工开挖面稳定性试验研究[J].长江科学院院报,2001,18(5):53-55. 被引量:63

共引文献30

同被引文献10

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部