期刊文献+

嫦娥一号绕月探测卫星精密定轨实现 被引量:49

Precision Orbit Determination of CE-1 Lunar Satellite
原文传递
导出
摘要 对探月任务精密定轨技术进行了论述,分析了轨道确定过程中的关键技术问题。基于SMART-1探月卫星测轨数据,对精密定轨软件系统进行了测试验证,3 d数据弧段定轨结果精度优于百米。在嫦娥一号任务实施过程中,各轨道段轨道的计算结果准确,卫星成功进入环月使命轨道,特别是原计划三次中途修正仅执行了一次,为卫星节约了宝贵的燃料。与外部星历互差的结果表明,整个任务阶段定轨精度在百米量级,环月段定轨精度约数十米。实施结果表明,该文给出的定轨技术理论正确,关键技术解决有效,完全满足探月任务工程测控和科学研究的需要。 We describe the technology of the orbit determination for the Lunar satellite,analyze and solve the key problems.The system of the precision orbit determination is verified and testified depending on the observation data of the SMART-1 Lunar satellite.The orbit determination can be obtained with an accuracy of 100 meters for three-day-arc data.During the CE-1 mission,the result of the orbit determination is accurate.The satellite inject the mission orbit successfully.There is only one middle course correction during the transfer orbit phase although three times of correction are prepared.The fuel is saved for the satellite.Compared with the ephemeris of CE-1 satellite from GEODYN II,the accuracy of the orbit determination is about 100 meters level for whole course and tens of meters for orbiting Lunar phase.It is shown that the technology described in the paper is correct,and the key problem is solved effectively.The system can satisfy the requirement of CE-1 mission.
出处 《武汉大学学报(信息科学版)》 EI CSCD 北大核心 2011年第2期212-217,共6页 Geomatics and Information Science of Wuhan University
基金 嫦娥一号探月工程资助项目
关键词 嫦娥一号探月卫星 绕月探测 精密定轨 测试验证 精度评估 CE-1 Lunar satellite Lunar exploration precision orbit determination verify and testify accuracy estimation
  • 相关文献

参考文献11

二级参考文献41

  • 1刘经南,魏二虎,黄劲松.深空网及其应用[J].武汉大学学报(信息科学版),2004,29(7):565-569. 被引量:9
  • 2李志林,朱庆.数字高程模型(第二版).武汉:武汉大学出版社,2007.
  • 3Smith W H F, Wessel P. Gridding with continuous curvature splines in tension. Geophysics, 1990, 55:293-305
  • 4Kaula W M. Theory of Satellite Geodesy. New York: Dover Publicationa, 2000
  • 5Sagitov M U, Bodri B, Nazarenko V S, et at. Lunar Gravimetry. London: Academic Press, 1986
  • 6Bills B G, Ferrari A J. A harmonic analysis of lunar topography. ICARUS, 1997, 31:244-259
  • 7Archinal B A, Rosiek M R, Kirk R L, et al. Report on the final completion of the unified lunar control network 2005 and lunar topographic model. U.S. Geological Survey Open-File Report, 2007
  • 8Cook A C, Spudis P D, Robinson M S, et al. Lunar topography and basins mapped using a Clementine stereo digital elevation model. Lunar Planet Sci, 2002, ⅩⅩⅩⅢ: 1281
  • 9Smith D E, Zuber M T, Neumann G A, et al. Topography of the Moon from the Clemenfine Lidar. J Geophys Res, 1997, 102:1591-1611
  • 10Zuber M T, Smith D E, Lemoine F G, et al. The shape and internal structure of the Moon from the Clementine Mission. Science, 1994, 266:1839-1843

共引文献97

同被引文献310

引证文献49

二级引证文献210

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部