接触网过渡施工技术 被引量:6

Transitional Construction Technologies of Overhead Contact Line
在线阅读 下载PDF
导出
摘要 为配合线路施工,接触网就涉及到过渡工程,接触网过渡工程依据线路改造的不同情况,采取区间曲内拨转、区间曲外拨转、区间双线同时拨转、车站过渡施工。区间上下行换边、新建网与既有网接火等方案合理组织,为配合轨道改建工程创造施工开通条件,并保证接触网改造施工顺利进行。 To coordinate with line constructions,transitional engineering is needed in the overhead contact line,which depends on the different situations of line transformations,adopting toggling inside the section,toggling outside the section,sectional double-line simultaneous toggling,and station transitional construction.Schemes of side change in up-and-down traffic and fire exchange between the newly-built lines and existing lines are rationally organized,so as to create construction operation conditions for track rebuilding projects,and ensure the smoothness of overhead contact line rebuilding construction.
作者 李和刚
出处 《铁道建筑技术》 2011年第1期59-62,共4页 Railway Construction Technology
关键词 接触网 铁道电气化 铁路提速 过渡方案 overhead contact line railway electrification railway speedup transitional scheme
  • 相关文献

参考文献1

  • 1中铁电气化局集团有限公司.电气化铁道接触网[M].北京:中国电力出版社,2004..

共引文献13

同被引文献41

引证文献6

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部