摘要 电网黑启动是指整个电网因故障全部停电后,通过本电网中具有自启动能力的机组启动,逐渐扩大电网失电的恢复范围,最后达到用尽量短的时间来恢复全网的运行和对用户的供电。文中通过对彭城电厂黑启动工程的实施及成功试验,说明了300 MW大机组作为黑启动电源是完全可行的。 After the power interruption caused by accident,the power network will gradually extend the recovery scope of power supply by starting up the power generation units having the capability of self start-up and finally achieves the goal of completely recovering the operation and power supply of the total power networks in the shortest time.According to the application and test results of the black start-up power project,the 300 MW power generation plants are proved to be able to play the role of black start-up power resource absolutely.
作者 王旭峰
出处 《江苏电机工程》 2011年第1期48-50,共3页 Jiangsu Electrical Engineering
关键词 黑启动 江苏电网 路径 试验 black start-up Jiangsu Grid path test
  • 相关文献

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部