摘要
清洁生产审核是将清洁生产理念转变为企业层次上操作的具体程序,在进行审核时首要步骤是确定审核重点。现阶段确定审核重点主要运用权重总和计分排序法,该方法易受审核者主观影响,审核质量不易控制。AHP-Fuzzy综合评价法作为一种系统分析方法很好地弥补了权重总和计分排序法的不足,在系统工程的很多领域都有广泛应用。通过确定银泰电源公司清洁生产审核重点,建立七工段层次模型:确立目标,明确问题;建立系统的层次结构;构造判断矩阵;进行层次的单排序及一致性检验;进行层次总排序一致性检验;根据排序结果,提出决策建议,验证了该综合评价法在清洁生产审核应用中的科学性、可行性和准确性,能将比较复杂、不够确定的多因素问题转化为有数字依据的简单易行的评价模式,为企业清洁生产的定量考核和指标化管理提供了一个科学的评价方法。
The Cleaner Production Audit was introduced into China along with the concept of Cleaner Production, The review the production process of the sewage Cleaner Production audit is the enterprise - level operating specific procedures, and the first step of the cleaner production audit is verification audit key. The present stage determination verification key main utilization weight sum total scoring rank order method, this method the verification subjective influence, the audit quality is not been easily easy to control. The AHP - Fuzzy as one of system analysis methods is very good at deal with the insufficiencies atonement weight sum total scoring rank order method, had been used widely in many domains of systems engineering. This topic by determination cleaner production audit key of Wuhan Intepower CO. , LTD, establishes seven construction section level models. The basic analysis steps are targeting, identifying problems, to establish the hierarchy of the system, structure comparison matrix, for single -level sorting and consistency check, for hierarchy of the consistency test. It makes policy recommendations according to sequencing results.
出处
《环境科学与管理》
CAS
2011年第2期149-152,共4页
Environmental Science and Management