摘要
结合黄河三门峡医院高层病房楼工程,介绍了该工程的后浇带设计,并从施工前准备工作,施工过程及质量验收等方面具体阐述了该工程的施工质量控制措施,实践证明,经采用上述质量控制措施,后浇带及防水工程取得了满意效果。
Combining with the Yellow River Sanmenxia hospital high-rise ward building project, it introduces the post-pouring strip design of the project, and expounds construction quality controlling measures from aspects of the pre-construction preparation, construction process, and quali- ty acceptance and so on. Practice proves that after adopting above-mentioned quality control measures, post-pouring strip and waterproofing project achieves satisfied effect.
出处
《山西建筑》
2011年第7期216-218,共3页
Shanxi Architecture
关键词
后浇带
浇筑
施工
质量控制
post-pouring strip, pouring, construction, quality control