摘要
结合具体工程实例及PHC管桩特点,从打桩准备工作和施工过程两方面详细介绍了PHC管桩施工中的质量控制措施及注意事项,并总结了施工经验,对今后类似PHC管桩工程具有一定指导意义。
Combining with specific engineering case and PHC pipe pile features, it specifically introduces the quality control measures and attention in PHC pipe pile construction process from two aspects of piling preparations and construction process, and summarizes construction experience, which has certain guiding significance for future similar PHC pipe pile engineering.
出处
《山西建筑》
2011年第7期215-216,共2页
Shanxi Architecture
关键词
PHC管桩
龄期
质量控制
打桩记录
PHC pipe pile, maturity, quality control, piling records