期刊文献+

广东2010年规划电网的可靠性评估 被引量:5

Reliability evaluation of Guangdong planned power grid in 2010
在线阅读 下载PDF
导出
摘要 应用电力系统可靠性评估原理,对广东2010年规划电网丰大和枯大2种运行方式分别进行了基于直流潮流法和交流潮流法的可靠性评估,计算了系统和节点的可靠性指标。结果表明:广东规划电网由于电源功率相对充裕、网络较强健等因素,2种方式下系统可靠性水平均较好。由于负荷的变化和机组开机方式的不同等原因,该电网枯大比丰大运行方式具有更高的可靠性。2种方式下,广东电网大部分节点可靠性较好,但佛山、广州、深圳等地区的部分节点可靠性相对较差。 The reliability of Guangdong planned power grid in 2010 for two typical operation modes is evaluated based on power system reliability evaluation principles by using the DC and AC power flow reliability assessment techniques. The system and bus reliability indices are computed. The evaluation results show that both two typical operation modes have high reliability due to adequacy of power sources, strong power network configurations and other factors. The reliability levels of two typical operation modes have a little difference because of different operation conditions including load levels and power supply capacity. Most buses have high reliability except some buses in Foshan, Guangzhou and Shenzhen areas.
出处 《中国电力》 CSCD 北大核心 2011年第2期1-5,共5页 Electric Power
基金 国家自然科学基金资助项目(50777067 51077135) 输配电装备及系统安全与新技术国家重点实验室自主研究资助项目(2007DA10512709103) 重庆市杰出青年基金资助项目(CSTC2010BA3006)
关键词 广东电网 电网规划 可靠性 充裕度评估 节点可靠性 Guangdong power grid power grid planning reliability adequacy evaluation bus reliability
  • 相关文献

参考文献13

二级参考文献64

共引文献176

同被引文献100

引证文献5

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部