摘要
为做好涉外工程,本文以印尼南苏4×600MW坑口电站为例,介绍本工程循环水系统的优化,通过技术经济比较,推荐用机械通风冷却塔代替自然通风冷却塔的循环水系统,在此类高温高湿地区是经济的和合理的,为以后工程提供设计经验。
he article take the project of South Sumatra 4×600MW mine mouth power plant as sample,introduced the optimization of the circulating water system of the project in order to exploit the international market and do the foreign project better.Compared with technique and economy,it is economical and reasonable after using machanical-draft water-cooling water instead of natural draft cooling water in the elevated temperature and high humidity area.The project provide the design experience for the similer condition area.
出处
《电力勘测设计》
2010年第6期48-52,共5页
Electric Power Survey & Design
关键词
机械通风冷却塔
涉外工程
高温高湿地区
优化设计
elevated temperature and high humidity area
circulating water system
cooling tower
lectotype
optimum design.