紧水滩水电厂计算机监控系统的建设和运行

Construction and operation of computer monitoring and control system of Jinshuitan Hydropower Plant
在线阅读 下载PDF
导出
摘要 紧水滩水电厂下辖2 个梯级水电站, 一级水电站为紧水滩电站, 二级为石塘电站, 其计算机监控系统已全部投入发电运行。紧水滩电站计算机监控系统采用标准的H9000 系统, 梯调和石塘站调采用SSJ3000 型计算机监控系统。紧水滩水电厂计算机监控系统不仅实现了分级监控功能, 而且实现了由梯调对两站的遥测、遥控、遥信、遥调功能, 实际运行情况及效果良好。系统在安全、经济运行以及减轻检修、运行劳动强度, 降低成本,企业减员增效等方面有显著的效益。 The Jinshuitan Hydropower Plant is composed of two cascade stations. One is Jinshuitan Hydropower Station and another is Shitang Hydropower Station. The computer monitoring and control system of these stations has been put into operation. The computer monitoring and control system for Jinshuitan Hydropower Station is standard H9000 system but that for cascade regulation and Shitang Hydropower Station is SSJ 3000 system. The computer monitoring and control system for Jinshuitan Hydropower Plant not only could realize the monitoring and control functions step by step but also have the functions of telemetering, remote control, remote communication and remote dispatching for two stations. Its actual operation and effect all are good. This system has produced obvious benefits in the aspects of realizing safe and economic operation, reducing check, repair, operation, saving the cost, reducing workers and increasing efficiency.
出处 《水力发电》 北大核心 1999年第12期39-41,共3页 Water Power
关键词 梯级水电站 计算机控制 监控 水电厂 cascade hydropower station, computer control, monitoring, Jinshuitan Hydropower Plant
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部