摘要
三峡水库形成后,由于库区架空直立式码头施工水位大幅度提高,传统码头结构型式的施工条件已不能满足,新型大桩柱、大跨度架空直立式码头结构,综合考虑了合理施工水位和施工的可能性,将成为三峡库区码头结构的新趋势。
After the Three Gorges reservoir having been built,the traditional wharf construction condition is unable to satisfy the requirements of new large-pile and large-span overhead vertical wharf due to the great increase of construction water level for overhead vertical wharf.Therefore,reasonable water level and possibility of construction must be considered comprehensively,that is a new trend of wharf structure for the Three Gorges reservoir.
出处
《港工技术》
2010年第6期35-37,共3页
Port Engineering Technology
关键词
三峡库区
施工水位
码头
Three Gorges reservoir
construction water level
wharf