摘要
隔河岩大坝建于90年代,以其新颖的结构和有效的消能方式以及高速的建设速度为世人瞩目,文章简单介绍了其结构布置及初期运行状况,特别是拦洪泄洪的大坝工作性状。
The Geheyan project was completed in 1990s. The dam is well-known for its distinctive structure. efficient energydissipation mode and fast construction. This paper briefly introduces the layout and operation mode of the dam. especially its flood control performance.
出处
《大坝观测与土工测试》
1999年第6期20-23,共4页
Dam Observation and Geotechnical Tests
关键词
拱坝
泄洪
运行
性状
重力拱坝
Qingjiang River Geheyan arch dam flood discharge operation performance