期刊文献+

Building up of CSRm Vacuum Baking-out System

Building up of CSRm Vacuum Baking-out System
在线阅读 下载PDF
导出
摘要 The project of the HIRPL-CSR is being done and the CSRm vacuum system was finished in March 2004. In order to meet the requirement of the beam storage time in HIRFL-CSR storage ring, the average vacuum degree of 6×10-9 Pa is requested in the ultra-high vacuum system. To reach the target, the vacuum baking-out system must be set up on the system so as to make it baked to about 250℃after the system being exposed to the atmosphere. The vacuum baking-out system main by consists of the thermal sensors, heating jackets (Fig.1), baking-out control system and so on. The project of the HIRFL-CSR is being done and the CSRm vacuum system was finished in March 2004. In order to meet the requirement of the beam storage time in HIRFL-CSR storage ring, the average vacuum degree of 6 × 10-9 Pa is requested in the ultra-high vacuum system. To reach the target, the vacuum baking-out system must be set up on the system so as to make it baked to about 250 ℃ after the system being exposed to the atmosphere. The vacuum baking-out system main by consists of the thermal sensors, heating jackets (Fig.l), baking-out control system and so on.
出处 《近代物理研究所和兰州重离子加速器实验室年报:英文版》 2004年第1期149-149,共1页 IMP & HIRFL Annual Report
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部