期刊文献+

HIRFL Operation and Upgrade

HIRFL Operation and Upgrade
在线阅读 下载PDF
导出
摘要 1. HIRFL Operation HIRFL accelerator complex was fully in operation in 2004. The main cyclotron SSC has been operated since July, 2004 after some time shut-down for upgrading the SSC power supply system, control and diagnostic system, and the main experimental area. The statistics of HIRFL operation time and beams delivered from HIRFL in 2004 is shown in Tables 1 and 2 respectively. During HIRFL operation in 2004, beam intensity from SFC typically 1-10 eμA, and from SSC typically a few hundred enA, such as 22Ne10+ 70 MeV/u, about 500 enA. 1. HIRFL Operation HIRFL accelerator complex was fully in.operation in 2004. The main cyclotron SSC has been operated since July, 2004 after some time shut-down for upgrading the SSC power supply system, control and diagnostic system, and the main experimental area. The statistics of HIRFL operation time and beams delivered from HIRFL in 2004 is shown in Tables 1 and 2 respectively. During HIRFL ,operation in 2004, beam intensity from SFC typically 1-10 eμA, and from SSC typically a few hundred enA, such as 22Ne10+ 70 MeV/u, about 500 enA.
作者 HIRFL team
出处 《近代物理研究所和兰州重离子加速器实验室年报:英文版》 2004年第1期139-139,141,142,共3页 IMP & HIRFL Annual Report
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部