介绍了采用座底式轻型仪器架进行30 m以内浅水深海流观测的两种系统布放方法:先锚后仪器架法和先仪器架后锚法。其中,详细介绍了先锚后仪器架法的布放过程,对先仪器架后锚法作了简要介绍。
Two methods for deployment of a shallow water current observational system are introduced.The both are applicable to deploy the system in the waters shallower than 30 m.The system with a light current-meter mounted in a frame will be sitting on sea bottom.By one method,the working procedure is to start with the anchor cast,and then to deploy the frame with the current meter.By the another,it is to start with the deployment of the frame with the current meter,and then to drop the anchor.The former deployment method is expounded in details.The latter is only briefly introduced.
出处
《海岸工程》
2010年第4期83-87,共5页
Coastal Engineering
基金
国家海洋局第一海洋研究所基本科研业务费专项资金--亚洲季风爆发的监测研究(GY02-2009G10)
关键词
海流观测
座底式
仪器架
系统布放
current observation
bottom-sitting
instrument frame
system deployment