台山核电站1#、2#取水隧洞是国内首条长距离大断面海底盾构隧洞工程,通过不断摸索和实践,成功地解决了盾构机选型、盾构始发、海底孤石预处理等几项关键技术和施工屏障,这些施工经验为今后的类似工程提供了借鉴和指导作用。
The 1# and 2# water intake tunnel of Taishan Nuclear Power Station project are the first undersea shield tunnels with a long distance and a large section in China.Type selection,commencement of shield machine,undersea boulder treatment and some other key techniques and construction barriers have been successfully done through continuous study and practice,the experience of which has provided the similar project with reference and guidance.